Weekly Traffic Advisories (June 30)

Traffic & Weather

Weekly Traffic Advisories (June 30)

Note: Each week the local listings are expanded and updated. During the week new and updated tasks are added. Every week a new post is started with fresh info but previous posts may be still valid

 

**** Municipal Release

Traffic Delay – Valleyfield Road

Location: Valleyfield Road from Tacoma Drive to Lawson Avenue

Date/Time: Friday, July 7 from 12 p.m. to 1:30 p.m.

Work details: This work includes asphalt repair, which supports the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: Stop and go traffic will be in place while work is underway. Motorists should expect delays and are asked to take alternative routes whenever possible.

.

Traffic Delay – Wright Avenue

Location: Wright Avenue between Williams Avenue and Finlay Drive

Date:  Saturday, July 8 from 8 a.m. to 7 p.m., and Sunday, July 9 from 9 a.m. to 7 p.m.

Work details: This work is to facilitate asphalt repair, which supports the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: Lane drops will be in place while work is underway. Motorists should expect delays and are asked to use alternative routes whenever possible.

.

Street Closure – Lower Water Street

Location: Lower Water Street between Prince Street and Sackville Street

Date: Sunday, July 9

Time: 8 a.m. to 4 p.m.

Work details: This work is to support underground utility work.

Traffic impact: : Traffic control personnel will be on-site while work is underway. Pedestrian access will be maintained. Motorists are advised to use alternative routes whenever possible.

.

Traffic Delay – Rocky Lake Drive

Location: Rocky Lake Drive from Powder Mill Bridge to General Liquids Canada

Date/Time: Thursday, July 6 from 12 p.m. to 4 p.m.

 

Work details: This work includes asphalt repair, which supports the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: Stop-and-go traffic will be in place while work is underway. Motorists should expect delays and are asked to take alternative routes whenever possible.

.

Road Closure – Gurholt Drive

Location: Gurholt Drive between Mosher Drive and Vidito Drive

Date: Thursday, July 6

Time: 7 p.m. to 7 a.m.

Work details: This road closures will be in place to facilitate road construction, which supports the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: A signed detour route will be in place. Local street access will be maintained and the sidewalks will remain open. Motorists should expect delays and are advised to use alternative routes whenever possible.

.

Traffic Delay – Wright Avenue

Location: Wright Avenue, between Williams Avenue and Finlay Drive

Date: Wednesday, July 5 and Thursday, July 6

Time: 9 a.m. to 4 p.m. and 6 p.m. to 8 p.m.

Work details: This work is to facilitate asphalt repair, which supports the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: Lane drops will be in place while work is underway. Motorists should expect delays and are asked to use alternative routes whenever possible.

.

Traffic Delay – Cobequid Road

Location: Cobequid Road from First Lake Drive to Lakeview Road

Date: Tuesday, July 4

Time: 1:30 p.m. to 4 p.m.

Work details: This work includes asphalt repair, which is in support of the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: Stop and go traffic will be in place while work is underway. Motorists should expect delays and are asked to take alternative routes whenever possible.

.

Traffic Delay – Beaverbank Road

Location: Beaverbank Road from Windgate Drive to Meadow Drive

Date: Tuesday, July 4

Time: 11:30 a.m. to 1:30 p.m.

Work details: This work includes asphalt repair, which is in support of the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: Stop and go traffic will be in place while work is underway. Motorists should expect delays and are asked to take alternative routes whenever possible.

.

Traffic Delay – Millwood Drive

Location: Millwood Drive from Sackville Drive to Rafting Drive

Date: Tuesday, July 4

Time: 9 a.m. to 11:30 a.m.

Work details: This work includes asphalt repair, in support of the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: Stop and go traffic will be in place while work is underway. Motorists should expect delays and are asked to take alternative routes whenever possible.

.

**** Provincial Media Release

NOTE: For the most up-to-date traffic notices, follow @511ns on Twitter at https://twitter.com/511ns , call 511 or visit: https://511.novascotia.ca/
——————————————————-

CONTINUING WORK

ANTIGONISH COUNTY: Route 245, Maryvale

Route 245, at the Old Maryvale Road intersection, will be open to local traffic only for replacement of three culverts. Work is expected to continue until July 21.

A detour is in place.

ANTIGONISH COUNTY: Salt Springs Brook Bridge, Trunk 7

Salt Springs Brook Bridge on Trunk 7, about four kilometres south of the Town of Antigonish, is reduced to one lane until further notice for repairs.

Temporary traffic signals are in place.

CAPE BRETON REGIONAL MUNICIPALITY: Highway 105, North Sydney

The intersection of Highway 105 and Tobin Road is reduced to one lane for roadwork until July 31.

Traffic control is on-site. Work takes place weekdays from 7 a.m. to 5:30 p.m.

COLCHESTER COUNTY: Donaldson Bridge, French River

Donaldson Bridge on Lake Road, about three kilometres west of Tatamagouche, is closed until further notice.

The detours are on Trout Brook Road and Cooper Road.

COLCHESTER COUNTY: Old Truro Road, Tatamagouche

Old Truro Road, from Kennedy Hill intersection to the Cross Road in North River, is closed until further notice due to a large culvert failure.

A detour is in place.

COLCHESTER COUNTY: Salmon River Bridge, Truro

Salmon River Bridge, on Highway 102 between exits 14 and 14A, is reduced to one lane northbound until October, due to work on the bridge decking.

Traffic control is on-site. Work takes place weekdays from sunrise to sunset.

COLCHESTER COUNTY: Slade Road, Tatamagouche

Slade Road is closed between Lake Road and West Tatamagouche Road until further notice because of a bridge closure.

CUMBERLAND COUNTY: Fountain Road, South Middleboro

Fountain Road, between Hunter Road and Simmonds Road, is closed for removal and replacement of the Howard Bridge until October 31.

Traffic will be detoured from Fountain Road via Simmonds Road and Keers Mill Road. Vehicles more than four metres wide need to plan an alternate route due to the width of structures on the detour route.

HALIFAX REGIONAL MUNICIPALITY: Highway 102, Bedford/Lower Sackville

Highway 102, from Exit 4A to Exit 4C, has lane reductions and intermittent road closures on the northbound and southbound highway for the construction of the Highway 107-Highway 102 Interchange.

Highway 102 northbound and southbound, Highway 101, Bedford Highway, Bedford Bypass, Duke Street, Glendale Avenue and Sackville Drive have intermittent road closures for blasting until Friday, July 7.

Traffic control will be on-site. Road closures for blasting occur between 9 a.m. and 3 p.m., Monday to Thursday, and from 9 a.m. to noon on Friday. Lane reductions occur from sunrise to sunset Monday to Thursday and from sunrise to noon on Friday.

HANTS COUNTY: Highway 101, Windsor

The eastbound off-ramp at Exit 6, Highway 101, is closed for the construction of a new interchange to downtown Windsor.

A detour is available via Exit 5A. The off-ramp is closed until September.

HANTS COUNTY: Hydes Bridge, Lantz

Hydes Bridge on Highway 277 is closed until further notice.

A detour is in place via Dutch Settlement Road, Elmsdale Road and Trunk 2. Signs are in place.

LUNENBURG COUNTY: Indian Path Bridge, Bayport

Indian Path Bridge, Route 332, is closed for replacement until further notice.

A detour is in place.

RICHMOND COUNTY: Port Royal Bridge, Isle Madame

Port Royal Bridge on Port Royal Road is closed until further notice. A detour is in place on MacEachern Road.

RICHMOND COUNTY: West Bay Road, Port Hawkesbury

West Bay Road, from Nature Dream Boulevard, easterly for 3.8 kilometres, is reduced to one lane for roadwork until September 30.

Traffic control is on-site. Work takes place weekdays from 6 a.m. to 6:30 p.m.

VICTORIA COUNTY: Highway 105, South Haven

Highway 105, from 3.2 kilometres west of Trunk 30, easterly to 600 metres east of Route 312, is reduced to one lane for roadwork until July 14.

Traffic control is on-site. Work takes place on weekdays from 7 a.m. to 5:30 p.m.

Leave a Reply

Your email address will not be published. Required fields are marked *