Punch Bowl Drive / Herring Cove Road – Road Surveying

Traffic & Weather

**** Halifax Water Release

Herring Cove Road – Road Surveying

From January 12-14 (weather permitting), Thompson Conn will be completing topographic survey work near 123 Herring Cove Road on behalf of Halifax Water. This work will occur between 8:30 AM and 4:30 PM each day and will require lane drops in the work area.

Experienced traffic control personnel will be on-site to manage traffic flows.

Motorists should expect delays and use alternate routes. Motorists are also reminded that speed fines double in work zones.

​.

Punch Bowl Drive – Road Surveying

From January 12-14 (weather permitting), Thompson Conn will be completing topographic survey work near 51 Punch Bowl Drive on behalf of Halifax Water. This work will occur between 8:30 AM and 4:30 PM each day and will require lane drops in the work area.

Experienced traffic control personnel will be on-site to manage traffic flows.

Motorists should expect delays and use alternate routes. Motorists are also reminded that speed fines double in work zones.

We apologize for any inconvenience this necessary infrastructure improvement work may cause.

For the safety of work crews and residents, please observe social/physical distancing requirements (2 metres of separation).

For more information on Halifax Water, please check www.halifaxwater.ca, visit us on YouTube, or Twitter @HalifaxWater, Facebook, or call our Customer Care Centre at 902-420-9287.

Leave a Reply

Your email address will not be published. Required fields are marked *