**** Municipal Release

Traffic Delay – Lucasville Road

Location: Lucasville Road at the bridge over the Sackville River

Date: Monday, May 6 until early 2025

Time: 24/7

Work details: This work is to facilitate the rehabilitation of the Lucasville Bridge. This is in support of the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: Temporary traffic signals will be installed to control traffic flow through the work site as work progresses on the Lucasville Bridge rehabilitation project. Motorists should expect delays and are asked to take alternative routes whenever possible.

.

Street Closure – Burnside Drive

Location: Burnside Drive, between Akerley Boulevard and Wright Avenue

Date: April 29, 2024 to June 2024

Time: 24/7

Work details: This work is needed to support the construction of a new roundabout at the intersection of Akerley Boulevard and Burnside Drive.

Traffic impact: Detours will be in place for vehicles and pedestrians.orists should expect delays and are asked to use alternative routes where possible

.

Road Closure – Hornes Road Bridge

Location: Hornes Road Bridge, between Cow Bay Road and Caldwell Road

Date: July 2, 2024 to November 2024

Time: 24/7

Work details: This closure is to facilitate the rebuilding of the bridge.

Traffic impact: A signed detour will be in place.

Halifax Transit will be re-routed and the following stops will be closed:

  • Hornes Road at civic 12 (2221)
  • Hornes Road at civic 42 (2222)
  • Hornes Road at civic 74 (2223)
  • Hornes Road after Cow Bay Road (7147)
  • Caldwell Road after Hornes Road (8663)
  • Hornes road after Scott Drive (8662)
  • Hornes Road at civic 41 (8661)
  • Hornes Road at civic 65 (8660)

For project details, visit: halifax.ca/hornesroadbridge.

.

Traffic Delay – Intersection of Belle Street, Abbington Avenue and Larry Uteck Boulevard

Location: Intersection of Belle Street, Abbington Avenue and Larry Uteck Boulevard

Date: Beginning Friday, July 12 and lasting for approximately one month

Time: 7 a.m. to 6 p.m. daily

Work details: This is to facilitate upgrades to the roadway and pedestrian infrastructure to the intersection.

Impact: Two lanes of traffic will be maintained with the use of an altered center line. Slow moving traffic is to be expected.

The following bus stops will be closed for the duration of the construction.

  • Larry Uteck Boulevard Before Abbington Avenue (7022)
  • Larry Uteck Boulevard Before Belle Street (7027)

.

Road Closure – LeMarchant Street

 

Location: LeMarchant Street, from Watt Street to Coburg Road

Date: Thursday, August 1 to Friday, August 30 (weekdays)

Time: 7 a.m. to 6 p.m.

Work details: This is to facilitate asphalt repairs. This is in support of the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: Local access will be maintained. Detours will be in place for vehicles and pedestrians while work is underway. Motorists should expect delays and are asked to use alternative routes where possible.

.

Traffic Delay – Wyse Road

Location: Wyse Road, between Albro Lake Road and Boland Street

Date: Thursday, August 1

Time: 9 a.m. to 4 p.m.

Work details: This work is to facilitate road repairs, which supports the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: An altered centreline will be in place while work is underway. Motorists should expect delays and are asked to use alternative routes wherever possible.

.

Traffic Delay – North Street

Location: North Street, between Gladstone and Robie streets

Date: Thursday, August 1 to Friday, August 2

Time: 7 p.m. to 6 a.m. (overnight work)

Work details: This is to facilitate pavement maintenance. This is in support of the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: There will be stop-and-go traffic in this area. Motorists should expect delays and are asked to use alternative routes where possible.

.

Road Construction – Intersection of Chebucto Road & Dublin Street

Location: Intersection of Chebucto Road and Dublin Street

Date: Thursday, Aug. 1 from 9 a.m. to 4 p.m. and Friday Aug. 2 from 9 a.m. to 2 p.m.

Work details: This work is for pavement maintenance, which supports the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: Stop and go will be in place while work is underway. Motorists should expect delays and are advised to use alternative routes whenever possible.

.

Traffic Delay – Almon Street

Location: Almon Street, between Robie and Windsor Streets

Date: Wednesday, July 31 to Friday, August 16

Time: 7 a.m. to 6 p.m.

Work details: This work is to facilitate road and sidewalk repair. This is in support of the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic Impact: Two-way traffic will be maintained with an altered centreline in place. The sidewalk on the north side between Gladstone Street and Windsor Street will be closed. Detours will be in place for pedestrians. Motorists should expect delays and are asked to use alternative routes where possible.

.

Traffic Delay – Pockwock Road

Location: Pockwock Road, from Hammonds Plains Road to White Hills Run

Date: Wednesday, July 31 to Thursday, August 1

Time: 9 a.m. to 4 p.m. each day

Work details: This work is related to repairing shoulders.

Traffic impact: The road will be reduced to two lanes while work is underway. Motorists should expect delays and are asked to take alternative routes whenever possible.

.

 Road Closure – Bell Road

Location: Bell Road, between Robie Street and Summer Street

Date: Tuesday, August 6 until Saturday, August 10

Time: 24/7

Work details: This work is to facilitate underground infrastructure for the Halifax Infirmary Expansion Project.

Traffic impact: Traffic control personnel will be on-site to direct both pedestrian and vehicular traffic while work is underway. Motorists should expect delays and are asked to use alternative routes wherever possible.

.

Intersection of Robie Street and Binney Street

Location: Intersection of Robie Street and Binney Street

Date: Wednesday, July 31 and Thursday, August 1

Time: 9 a.m. to 4 p.m.

Work details: This work is for pavement maintenance, which supports the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: Lane drops will be in place while work is underway. Motorists should expect delays and are asked to use alternative routes wherever possible.

.

Traffic Delay – Hammonds Plains Road

Location: The shoulder of Larry Uteck Boulevard, from Broad Street Hammonds Plains Road

Date: Tuesday, July 30

Time: 9 a.m. to 4 p.m.

Work details: This work is related to regrading gravel shoulders.

Traffic impact: The road will be reduced to two lanes while work is underway. Motorists should expect delays and are asked to take alternative routes whenever possible.

.

Traffic Delay – University Avenue

Location: University Avenue, from Robie Street to South Park Street

Date: Tuesday, July 30

Time: 9 a.m. to 4 p.m.

Work details: This work includes road repair, in support of the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact:  Stop and go traffic will be in place while work is underway. Motorists should expect delays and are asked to take alternative routes whenever possible.

.

Traffic Delay – Almon Street

Location: Almon Street, from Agricola Street to Robie Street

Date: Thursday, July 25 until Thursday, August 1

Time: 7 a.m. to 7 p.m.

Work details: This work is to facilitate the excavation for sidewalks and bike lanes, which supports the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: An altered centreline will be in place while work is underway. Two way traffic will be maintained. Motorists should expect delays and are asked to use alternative routes wherever possible

.

Traffic Delay – Oxford Street

Location: Oxford Street, from Jubilee Road to Coburg Road

Date: Friday, July 26 to Friday, August. 2 (weekdays only)

Time: 9 a.m. to 4 a.m.

Work details: This is required for gas service installation.

Traffic impact: Lane drops and stop and go traffic control will be in place while work is underway. Sidewalk access will be limited to one side of the road. Motorists should expect delays and are asked to use alternative routes whenever possible.

.

Road Closure – Downtown Horse Show

Location: Bell Road, from Trollope Street to Sackville Street

Date: July 28

Time: 7 a.m. to 8 p.m.

Details: This is to facilitate the Downtown Horse Show.

Traffic impact: Detours will be in place for vehicles. Motorists should expect delays and are asked to use alternative routes whenever possible.

.

Traffic Delay – Highway 7

Location: Highway 7, from Old Trunk 7 Road and Brooks Drive.

Date: July 29 to December 15

Time: 7 a.m. to 7 p.m. (weekdays only)

Work details: This work includes road repair in support of the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: An altered centreline and stop and go traffic will be in place while work is underway. Motorists should expect delays and are asked to take alternative routes whenever possible.

.

**** Provincial Media Release

——————————————————-NOTE: The projects listed below are planned road and bridge work. For the most up-to-date provincial traffic notices follow @511ns on the X platform, formerly Twitter, at https://twitter.com/511ns , call 511 or visit: https://511.novascotia.ca/———————

NEW WORK

PICTOU COUNTY: Highway 106

Highway 106 between Exit 2 and Highway 104, about 7.2 kilometres, will be reduced to one lane for the installation of rumble strips beginning Monday, July 29.

Completion is tentatively scheduled for Friday, August 2.

Work takes place weekdays from 6 a.m. to 8:30 p.m. Traffic control is on-site.

CONTINUING WORK

ANTIGONISH COUNTY: Dunmore Road, Dunmore

Dunmore Road is closed from Marsh Cross Road to Blacksmith Valley Road until Monday, September 30, to replace Dunmore Brook Bridge.

A detour is in place.

ANTIGONISH COUNTY: Highway 104

Highway 104 from the Exit 38 eastbound off-ramp to 300 metres west of the Trunk 4 underpass is reduced to one lane for paving until Wednesday, July 31.

Work takes place weekdays from 6 a.m. to 6:30 p.m. Traffic control is on-site.

CAPE BRETON REGIONAL MUNICIPALITY: Barrachois Harbour Bridge, Barrachois Harbour

The Barrachois Harbour Bridge, on Route 223 near Long Island Road, is reduced to one lane for bridge work until Thursday, August 8. The maximum width for loads in the open lane is three metres.

Traffic signals are in place. The lane is closed 24 hours a day.

CAPE BRETON REGIONAL MUNICIPALITY: Kenwood Drive, Sydney River

Kenwood Drive from Oceanview Drive to Kings Road will be closed for construction of a roundabout until Saturday, August 24.

A detour is in place.

COLCHESTER COUNTY: Donaldson Bridge, French River

Donaldson Bridge on Lake Road, about three kilometres west of Tatamagouche, is closed until further notice.

The detours are Trout Brook Road and Cooper Road.

COLCHESTER COUNTY: Old Truro Road, Tatamagouche

Old Truro Road from the Kennedy Hill intersection to Cross Road in North River is closed until further notice because of a large culvert failure.

A detour is in place.

COLCHESTER COUNTY: Slade Road, Tatamagouche

Slade Road is closed between Lake Road and West Tatamagouche Road until further notice because of a bridge closure.

CUMBERLAND COUNTY: Route 366

A section of Route 366 is closed because of a culvert failure. Only local traffic is allowed from East Amherst to Port Howe. A detour is available via Trunk 6.

The culvert is expected to be replaced this summer.

HALIFAX REGIONAL MUNICIPALITY: Highway 102, Bedford / Lower Sackville

Highway 102 near Exit 4C has regular lane closures and construction in both directions until Saturday, August 31, for construction of the Highway 107-Highway 102 interchange.

Work takes place weekdays from 7 a.m. to 3 p.m. in the northbound lanes and 9 a.m. to 6 p.m. in the southbound lanes. Traffic control is on-site. Both lanes will be open in the evening and overnight.

Motorists should expect delays and should use alternative routes when possible.

HALIFAX REGIONAL MUNICIPALITY: Highway 111 (Windsor Street Exchange), Halifax

Construction on the structure over Mackintosh Street will continue until further notice.

Traffic control is on-site.

INVERNESS COUNTY: Cameron Road, Orangedale

Cameron Road from Orangedale Road westerly to Southwest Ashfield Road will have alternating lane closures for gravelling, ditching and culvert repairs until Saturday, August 17.

Traffic control is on-site. Work takes place weekdays from 7 a.m. to 7 p.m.

INVERNESS COUNTY: Highway 105, Glendale to River Denys

The section of Highway 105 from Exit 2 to Exit 3 is reduced to one lane for paving until Saturday, August 31.

Traffic control is on-site. Work takes place on weekdays from sunrise to sunset.

PICTOU COUNTY: Route 348, Sunnybrae

Route 348 from the Pictou–Guysborough county line northerly for seven kilometres is reduced to one lane for paving until Friday, August 30.

Work takes place weekdays from 6 a.m. to 8 p.m. Traffic control is on-site.

PICTOU COUNTY: Trunk 4, Telford

Trunk 4 between civic numbers 8532 and 8628 will be closed for culvert replacement until Monday, July 29.

A detour is in place via Route 245 (Shore Road) and Lamont Road. Motorists are advised to follow the signed detour and use caution when travelling near the construction zone.

RICHMOND COUNTY: Port Royal Bridge, Isle Madame

The Port Royal Bridge on Port Royal Road is closed until further notice. A detour is in place on MacEachern Road.

RICHMOND COUNTY: St. Peters Fourchu Road, Saint Esprit

St. Peters Fourchu Road will have alternating lane closures for repaving until Monday, September 30.

Traffic control is on-site. Work takes place from sunrise to sunset. Weekend work is expected.

SHELBURNE COUNTY: Highway 103, Jordan Falls

Highway 103 from Exit 24 easterly for about 7.9 kilometres will have alternating lane closures for paving until Thursday, August 1.

Work takes place weekdays from sunrise to sunset. Traffic control is on-site.

SHELBURNE COUNTY: Highway 103, Sable River

Highway 103 from the Sable River Bridge easterly for about six kilometres will have alternating lane closures for repairs until Saturday, August 31.

Work takes place weekdays from sunrise to sunset. Traffic control is on-site.